Admirals Road going under microscope

Esquimalt council takes first look at conceptual upgrade plan

To move more people safely in and out of Esquimalt, bike lanes may be added along Admirals Road, one of the busiest commuter routes in the township.

While the plan is still in its infancy, council agreed in principle at Monday’s committee-of-the-whole meeting to seek the maximum $2.8 million available in federal gas tax funding from the Union of B.C. Municipalities.

Conceptual plans shown to council for the first time reveal changes to Admirals Road, from Lyall Street to Maplebank Road. Traffic lanes and some parking would be lost to make room for flanking bike lanes.

“I think this is actually a great proposal for that corridor down there,” Coun. Bruce McIldoon said of a notoriously narrow, curved and hilly section between Esqumalt Road and Naden. “In fact, the parking is dangerous.”

Enthusiasm for the proposal at the council table was tempered with concerns that parking reductions would impact businesses, and fewer lanes would add to congestion in the township.

“We’ll probably see it at peak times,” said Jeff Miller, Esquimalt’s director of engineering and public works.

In his staff report, Miller estimated that more than 4.6 million annual vehicle trips are made on Admirals Road, which connects several municipalities with a population of more than 300,000. Nearby, there are more than 6,500 employees at CFB Esquimalt and the Esquimalt graving dock.

Mayor Barb Desjardins, who voted against moving the proposal forward, said this highlights the need for municipalities to work together to address traffic flow between cities.  Coun. Don Linge, concerned the project would mean additional costs for the township, also voted against it.

“To me that’s only looking to our border and we can’t do that,” Desjardins said.

“I think it’s a great project but I think it’s come before its time.”

It could be this fall before municipal staff hear back about the UBCM application, said Miller, adding that if funding can be secured and if the plan goes like clockwork, upgrades could begin as early as next year.

Staff say the plan includes hiring a consultant to help organize open houses before the roadway design is finalized.

emccracken@vicnews.com

 

 

 

 

 

 

 

Just Posted

Sidney could take additional action around speculation tax

Council to consider steps later this fall after staff review of provincial statistics

Victoria People’s Party candidate says campaign signs stolen around city

PPC candidate Alyson Culbert says she finds theft ‘disturbing’

VIDEO: Greater Victoria, here’s the news you missed this weekend

Andrew Berry trial nears end, Victoria joins tree-planting pledge and more

Three second-half goals lead Cavalry over Victoria’s Pacific FC

Cavalry FC downed Pacific FC 4-1 on Sunday in Canadian Premiere League action

Island music trivia tournament a hit on World Alzheimer’s Day

More than $13,000 raised by people naming that tune

PHOTOS: Steller sea lion with plastic around neck rescued on Vancouver Island

Rescue staff determined the plastic band cut the protected animal’s neck approximately two inches

B.C. VIEWS: School officials join fact-free ‘climate strike’

Students, public get distorted picture of greenhouse gases

Handgun crackdown, health spending and transit plans latest campaign promises

Friday was the end of a busy week on the campaign trail

B.C. woman photographs massive ant swarm on Abbotsford driveway

She asked what the ants were doing? The answer: war

Iconic 90s TV show ‘Friends’ celebrates 25th anniversary

The iconic, decade-long television show aired its first episode 25 years ago today

Most Read