There will be single lane alternating traffic in the work zones of both sections during work hours, Niagara Street to Dock Street (Section 1) and Clover Point to Cook Street (Section 7). (File photo)

Traffic delay coming down the pipe for Dallas Road

Pipe installation begins next week at Ogden Point and Clover Point

Traffic disruptions are expected along Dallas Road starting next week as new pipe is laid as part of the Wastewater Treatment Project.

The installation of the pipe along Dallas Road from Clover Point to Ogden Point is anticipated to begin Jan. 7.

Work will start at each end of the pipe and will be completed in sections, starting with the stretch from Niagara Street to Dock Street (Section 1) and Clover Point to Cook Street (Section 7).

RELATED: WATCH: Sewage pipe makes slow journey toward the ocean

There will be single lane alternating traffic in the work zones of both sections during work hours, which are Monday to Friday from 7:00 a.m. to 7:00 p.m. and Saturday from 10:00 a.m. to 7:00 p.m.

The section between Niagara and Dock Streets will have single lane alternating traffic in the work zone overnight as required.

A portion of Dallas Road between Niagara and Dock streets will be temporarily closed one or two days a week during work hours as the pipe is moved into the trench. Detours will be implemented.

There will be some parking impacts on Dallas Road and vehicle access to residents and businesses may be temporarily restricted but residents will be notified in advance.

Bus stops may be temporarily impacted on Dallas Road between Niagara and Montreal streets. BC Transit will post notifications at the stop.

RELATED: Capital Regional District moves pipeline to save up to 50 trees

The Wastewater Treatment Project includes the construction of a pipe which will transport wastewater from the Clover Point Pump Station to the McLoughlin Point Wastewater Treatment Plant for tertiary treatment. This pipe, called the Clover Forcemain, will run along Dallas Road from Clover Point to Ogden Point, where it will connect to the Victoria cross-harbour undersea pipe. Construction began in October 2018 and is anticipated to take approximately two years to complete.

The Wastewater Treatment Project will provide tertiary treatment for wastewater from the core area municipalities of Victoria, Esquimalt, Saanich, Oak Bay, View Royal, Langford and Colwood, and the Esquimalt and Songhees Nations by the end of 2020.

Follow us on Instagram
Like us on Facebook and follow us on Twitter.

Just Posted

Western Speedway racing legend ‘The Flying Plumber’ turns 98

Dave Cooper recalls car crashes, his first win, and more

Second puppy killed by poisonous mushrooms in Victoria

Springer spaniel puppy died after consuming mushrooms in Fairfield neighbourhood

Driver charged in Central Saanich pedestrian’s death appears in court

Victim Kim Ward, 51, died on scene at the August 2018 crash

Langford homeowner helps West Shore RCMP catch car thief

The homeowner grabbed the suspect until the police arrived moments later

Nuisance tree will remain on perimeter of Fireman’s Park

Council re-affirm pledge to protecting healthy tree canopy

WATCH: Greater Victoria’s top stories of the day

A round-up of the day’s top stories

POLL: Do you think the day of the federal election should be a statutory holiday?

Increasing voter turnout has long been a goal of officials across the… Continue reading

Fatal overdoses down by 33% in B.C., but carfentanil deaths continue to spike

Carfentanil, an illicit drug more powerful than fentanyl, causing more deaths than ever

Two RCMP vehicles vandalized in Duncan over long weekend

Local Mounties asking for help in finding culprits

A year after pot legalization in Canada, it’s a slow roll

It’s one year into Canada’s experiment in legal marijuana, and hundreds of legal pot shops have opened

ELECTION 2019: Climate strikes push environment to top of mind for federal leaders

Black Press Media presents a three-part series on three big election issues

Tickets available for Greater Victoria Sports Hall of Fame dinner and induction

Ryan Cochrane, Mike Piechnick and Rob Short among the inductees

Most Read