There will be single lane alternating traffic in the work zones of both sections during work hours, Niagara Street to Dock Street (Section 1) and Clover Point to Cook Street (Section 7). (File photo)

Traffic delay coming down the pipe for Dallas Road

Pipe installation begins next week at Ogden Point and Clover Point

Traffic disruptions are expected along Dallas Road starting next week as new pipe is laid as part of the Wastewater Treatment Project.

The installation of the pipe along Dallas Road from Clover Point to Ogden Point is anticipated to begin Jan. 7.

Work will start at each end of the pipe and will be completed in sections, starting with the stretch from Niagara Street to Dock Street (Section 1) and Clover Point to Cook Street (Section 7).

RELATED: WATCH: Sewage pipe makes slow journey toward the ocean

There will be single lane alternating traffic in the work zones of both sections during work hours, which are Monday to Friday from 7:00 a.m. to 7:00 p.m. and Saturday from 10:00 a.m. to 7:00 p.m.

The section between Niagara and Dock Streets will have single lane alternating traffic in the work zone overnight as required.

A portion of Dallas Road between Niagara and Dock streets will be temporarily closed one or two days a week during work hours as the pipe is moved into the trench. Detours will be implemented.

There will be some parking impacts on Dallas Road and vehicle access to residents and businesses may be temporarily restricted but residents will be notified in advance.

Bus stops may be temporarily impacted on Dallas Road between Niagara and Montreal streets. BC Transit will post notifications at the stop.

RELATED: Capital Regional District moves pipeline to save up to 50 trees

The Wastewater Treatment Project includes the construction of a pipe which will transport wastewater from the Clover Point Pump Station to the McLoughlin Point Wastewater Treatment Plant for tertiary treatment. This pipe, called the Clover Forcemain, will run along Dallas Road from Clover Point to Ogden Point, where it will connect to the Victoria cross-harbour undersea pipe. Construction began in October 2018 and is anticipated to take approximately two years to complete.

The Wastewater Treatment Project will provide tertiary treatment for wastewater from the core area municipalities of Victoria, Esquimalt, Saanich, Oak Bay, View Royal, Langford and Colwood, and the Esquimalt and Songhees Nations by the end of 2020.

Follow us on Instagram
Like us on Facebook and follow us on Twitter.

Just Posted

Safety is top priority, concern for realtors after warning issued on Lower Mainland

Greater Victoria Real Estate Board president said realtors should contact police if they experience suspicious behaviour

New accessible flush toilets coming to Elk/Beaver Lake

Construction of $1.1M project expected to run until end of year

London Drugs augments local recycling options with Saturday special

Residents can drop off recyclable items, including electronics this weekend

Wounded Warriors steps up for Coast Guard volunteers

Mental health charity aids Canadian Armed Forces members, veterans, first responders and families

VIDEO: B.C.’s waving granny gets incredible send-off from school kids

Tinney Davidson has been waving at students on their way to school for over 11 years, but is moving in a month

Wanted by Crime Stoppers

Greater Victoria Crime Stoppers is seeking the public’s help in locating the… Continue reading

POLL: Do you think the Notre Dame Cathedral in Paris should be rebuilt?

Images of one of the word’s most iconic landmarks were seared into… Continue reading

Isn’t it spring? Forecast calling for snow across eastern B.C.

Up to 10cm expected within 48 hours; motorists urged to prepare for deteriorating conditions

B.C. parents still missing out on hundreds of thousands in free money

Chilliwack financial advisor still banging the drum over unclaimed $1,200 RESP grant cash

Be wary of robot emotions; ‘simulated love is never love’

Research has shown that people have a tendency to project human traits onto robots

One million recyclable bottles ‘lost’ daily in B.C., foundation says

387 million beverage containers didn’t make it back into the province’s regulated deposit refund system in 2017

Island-born Snowbirds pilot enjoying homecoming in skies over Comox

Logan Reid once stood clinging onto the fence outside the Comox Air… Continue reading

Attack on student in Courtenay ‘way more than bullying’, says mom

A Comox Valley mother said “it was way more than bullying” at… Continue reading

Most Read