Workers laying sewer main (File photo)

City of Langford mails out information on sewer connection requirement

Plan lays out obligations, exemptions and financial assistance information for the costly hookup

The City of Langford is sending mailouts this month directing property owners to connect their sewer systems to the city’s network before the end of the year.

The booklet also contains instructions on financial assistance and exemptions related to the costly hookup.

According to the accompanying cover letter, five per cent of residents who have Langford’s sewer main on their streets are informed to adhere to the city’s mandatory connection bylaw.

ALSO READ: Langford residents concerned about hefty sewage bill

“Council has enabled mandatory connection to ensure the long-term viability of the City’s sewer infrastructure,” it states.

The brochure asks residents to complete a ‘sewer application’ at Corix West Shore Environmental Services (WSES) before choosing a qualified contractor to connect their pipes to the sewer line.

Single family households are expected to pay $10,291 to WSES for a Sewer Capital Recovery Fee, according to the city, including an additional physical connection fee (PCF). PCF costs are $1,500 per inch diameter of pipe.

ALSO READ: Mandatory sewer hookups a huge burden in Langford

Residents who receive the authorization form are then asked to pay a $50 fee for a plumbing permit from the city, plus a damage deposit, the brochure states.

After the the sewer connection is complete, the connection is required to be inspected by the City of Langford.

“All on-site works are to be constructed to the BC Plumbing Code and any applicable bylaws or regulations,” it states.

Households that earn less than $38,921 can apply for a five-year exemption, and properties with a septic system less than five years old are eligible to defer the connection until their system reaches that age.

ALSO READ: Langford cleans up its sewer bylaws

Households with an income in the $38,921 to $67,842 range that are rejected for a loan from TD Canada Trust may apply directly to the city for financial assistance, it adds. The fees are then to be paid at a two per cent interest rate over a 10-year period.

The booklet is available here and the cover letter here.

*Editor’s note: An earlier version of this article incorrectly stated physical connection fee costs. They are $1,500 per inch diameter of pipe.

swikar.oli@goldstreamgazette.com


Like us on Facebook and follow us on Twitter

Just Posted

West Shore RCMP receives five cougar reports in two days in Colwood

Colwood and Sangster Elementary Schools taking precautions

Union, Labour Council mark Day of Mourning at Camosun College

Public ceremony at Lansdowne Campus set for April 26

French for the Future event to host 300 students in Victoria

Victoria event welcomes students from Greater Victoria and Vancouver

VIDEO: Large dust devil swirls through town in B.C.’s interior

Residents look on as column climbs about 90 feet into the air

Wanted by Crime Stoppers

Greater Victoria Crime Stoppers is seeking the public’s help in locating the… Continue reading

POLL: Do you think the Notre Dame Cathedral in Paris should be rebuilt?

Images of one of the word’s most iconic landmarks were seared into… Continue reading

Blaine, Wash. inn owner, charged with smuggling people into B.C., granted bail

Robert Joseph Boule ordered to turn away anyone indicating a plan to enter Canada illegally

RCMP arrest B.C. man following threatening Vaisakhi Facebook post

Post made reference to pressure cooker bomb at massive Surrey parade

Second dump site of Dungeness crab discovered in northern B.C.

DFO confident new site related to larger April 2 dump

Northern B.C. high school student reaches 100,000 followers on YouTube

Voice actor, animator, Jericho Fortune has more than 30-million views on his channel GTAGAMER222

University mourns student who died in B.C. canoeing accident

Andrew Milner, 19, was in his second year with the University of Calgary’s basketball program

Most Read