Computer system cost control needed: auditor

Auditor General Carol Bellringer says big computer upgrades are a problem the world over, not just at ICBC and the B.C. health ministry

B.C. Auditor-General Carol Bellringer

B.C.’s auditor general is recommending a new oversight system for information technology project costs, as the province struggles to update old computer systems that control everything from vehicle insurance to health records.

The B.C. government spent $668 million on information technology in the last fiscal year, Auditor General Carol Bellringer said in a report released this week.

Bellringer reported in 2015 that a health ministry system to track infectious diseases ran more than four times over its original budget and was five years late. The province’s Integrated Case Management System for vulnerable children and adults was declared complete only after its function was downgraded.

And a student data system for school districts, implemented for $95 million to replace another system that had proven costly and unreliable, had its own glitches and slowdowns when it was put in place for the 2015 school year.

B.C. Finance Minister Mike de Jong says information systems are among the most difficult projects to manage for government, which often lacks the in-house expertise to supervise them. The government says it is moving ahead on Bellringer’s recommendation to set up central oversight of projects across the government, and mandate letters for all ministries next year will require significant IT projects to be reported to the responsible minister.

NDP critic Bruce Ralston said the government recently fired the main contractor for its “Clinical Systems Transformation Project” in the health ministry, an $842 million system with an uncertain future.

He said other IT projects that ran into trouble and over-budget include BC Hydro’s system upgrade and JUSTIN, a criminal case management database for police investigations, court documents and victims or witnesses of crime.

“The immense waste and mismanagement of the Christy Clark government comes down to wasted money on companies like IBM for faulty systems that should have gone to front-line services for kids in care, students and patients,” Ralston said.

Bellringer’s review found that problems with IT systems are found in all government and private sector organizations. World-wide, one out of five IT projects fails, and the majority have significant problems not anticipated at the outset.

 

Just Posted

Fun zone the heart of Sooke’s 20th-anniversary celebration

Donations in remembrance of Hannah Day showed the community’s generosity

Junior Shamrocks fall to Northmen in 2019 Minto Cup

Orangeville tops Victoria in three-game sweep

Buffy the audience slayer: St. Marie coming to Sidney

Powerful live shows a big part of veteran Canadian folk star’s success; she’s here Sept. 26-27

Victoria Shamrocks shoot for the WLA title on home floor

Senoir lacrosse team takes on Maple Ridge in Colwood Sunday at 6 p.m.

Oak Bay doctor the pulse of Island’s heart failure clinic

Dr. Elizabeth Swiggum has headed heart clinic for past 14 years

Trudeau to meet with U.K. and Japanese prime ministers ahead of G7 summit

French President Emmanuel Macron, this year’s G7 host, has little expectations of a unified front from the leaders

Vancouver Island man dead after reported hit-and-run incident

Oceanside RCMP seek public’s help gathering information

Thousands cycle to conquer cancer

The 11th annual Ride to Conquer Cancer took place Saturday morning, Aug. 24 in Surrey, B.C.

PHOTOS: Brazil military begins operations to fight Amazon fires

Amazon fires have become a global issue, escalating tensions between Brazil and European countries

Racist confrontation in Richmond parking lot caught on camera

Woman can be heard yelling racial slurs, swear words at woman in apparent parking dispute

Groups ready campaign to help young voters identify ‘fake news’ in election

The media literacy campaign to focus on identifying misinformation and suspicious sources online

Big rally in northern B.C. draws attention to continuing lumber crisis

Mayor Joan Atkinson says about 400 workers have been directly affected by the closure of the Canfor mill

Orangeville Northmen take Minto Cup at Langley Events Centre

Swept best-of-five series 3-0 over Victoria Shamrocks

Expanded support to help B.C. youth from care attend university still falling short

Inadequate support, limited awareness and eligibility restrictions some of the existing challenges

Most Read